|
Willow Creek (Creede CO)
August 26-September 1, 2000

Sequence of Events
Sequence of Events
| Aug. 26, 2000 |
Stream measurement and reconnaissance (E. Willow) |
| Aug. 27, 2000 |
Stream measurement and reconnaissance (Lower Willow); Tracer
injection begins (Lower Willow) |
| Aug. 28, 2000 |
Water quality sampling for synoptic study (Lower Willow) |
| Aug. 29, 2000 |
Tracer injection begins (E. Willow); Stream measurement and reconnaissance
(W. Willow) |
| Aug. 30, 2000 |
Water quality sampling for synoptic study (E. Willow) |
| Aug. 31, 2000 |
Stream measurement and reconnaissance (W. Willow); Tracer Injection
begins (W. Willow) |
| Sept 1, 2000 |
Water quality sampling for synoptic study (W. Willow) |
Footwear
|