Lower Tenmile Creek
September 2-7, 1998
Objectives & Sequence of Events
Objectives
Sequence of Events
| September |
| 2 |
Injection setup. |
| 3 |
Injection begins (0910). Tracer sampling. |
| 4 |
Injection continues; tracer sampling. |
| 5 |
Injection continues; tracer sampling. |
| 6 |
Synoptic sampling; spot injections; stream discharge
measurements. Injection ends (1900). |
| 7 |
Tracer Sampling |
Photo Gallery
Sampling Locations
| str | - stream site
|
| rbi | - right bank
inflow |
| lbi | - left bank
inflow |
| 999 | - number
corresponds to distance from injection site in feet. |
Results & Acknowledgments
Results
Data analysis is incomplete at this time.
Acknowledgments
The Lower Tenmile synoptic was done in cooperation with the
U.S. Environmental Protection Agency.
Field assistance was provided by Jesse Aber, Dorothy Barnett,
Mike Bishop, Tom Cleasby, Deann Dutton, Pat Hettinger, Dave Johnson,
Kevin Johnson, Eloise Kendy, John Kilpatrick, Patty Ladd, John Lambing,
David Nimick, Chuck Parrett, Joanna Thamke,
and members of the research team.