August
27 Injection setup. Injection site is at ~417 ft. Injection begins (1650).
28 Injection continues
29 Pump failure in early morning hours. Pumps restarted at a higher rate. Synoptic sampling (0820-1750). Spot injections and pygmy meter measurements at Transport Sites SAM-3 and SAM-5. Tracer injection terminated due to second pump failure (~1600).
30 Sampled tracer departure. Remaining injectate dumped (1010). Tracer sampling continued.



Photo Gallery

Sampling Locations
str - stream site
rbi - right bank inflow
lbi - left bank inflow
999 - number corresponds to distance from injection site, in meters.

Distance Type Description



780 str Transport Site SAM-1
780 str_b Transport Site SAM-1
1413 str Confluence of adit discharge (right) with Uncle Sam (left)
1461 str
1510 str
1829 rbi
1829 rbi_b
1829 rbi_c
2286 lbi
3777 str Transport Site SAM-2
4650 rbi
4763 rbi
4763 rbi_b
5264 rbi
5264 rbi_b
5830 str Transport Site SAM-3
6088 rbi Confluence of Jack Mtn. Tributary (left) and Uncle Sam (right)
6088 rbi_b Confluence of Jack Mtn. Tributary (left) and Uncle Sam (right)
8374 lbi
8374 lbi_b
9200 str Transport Site SAM-4
9400 rbi
10289 lbi
11006 lbi
11006 lbi_b
14540 str Transport Site SAM-5
15314 str
15671 lbi
16471 rbi



Results & Acknowledgments

Results

Data analysis is incomplete at this time.

Acknowledgments

Field assistance was provided by Fred Bailey, Mike Cannon, Tom Cleasby, Deann Dutton, Kevin Johnson, Mike Gooseff, David Nimick, Phil Verplanck, Laurie Wirt, and members of the research team.