Toxics Substances Hydrology - Upper Arkansas River Basin




Animas River
A72 to Elk Park
August 16-18, 1998



Objectives & Sequence of Events

Objectives

Sequence of Events

August
8 Stream measurement and reconnaissance
16 Tracer Injection Begins
17 Synoptic Sampling
17 Tracer Injection Terminates
18 Sampling of Tracer Departure



Photo Gallery

Sampling Locations
str - stream site
rbi - right bank inflow
lbi - left bank inflow
999 - number corresponds to distance from injection site, in meters.

Distance Type Description



2922 rbi Unsampled Inflow (inaccessible)
3763 lbi Deer Park Creek
5123 rbi Sultan Creek
5723 lbi
5723 lbi_b
6538 lbi
6538 lbi_b
6788 str
8486 rbi Molas Creek (photo taken August 18)
8651 str Transport Site ELK-4 (photo taken August 18)
10231 lbi Elk Park Creek
10621 str Animas River below Elk Park Creek



Results & Acknowledgments

Results

Data analysis is incomplete at this time.

Acknowledgments

The Elk Park synoptic was done in cooperation with the U.S. Bureau of Land Management and the U.S. Forest Service. Field assistance was provided by Ken Leib, Ed Vaill, Bob Jenkins, Bill Carey, and members of the research team.

The Durango & Silverton Narrow Gauge Railroad provided valuable assistance and support.