Toxics Substances Hydrology - Upper Arkansas River Basin




Bullion Mine
August 30 - September 1, 1998



Objectives & Sequence of Events

Objectives

Sequence of Events

Aug 30 Injection setup. Injection site is at ~15 ft. Injection begins (1603).
31 Injection continues
Sept 1 Synoptic Sampling. Spot injection at Transport Site BUL-3. Injection terminates (1710). Sampling of tracer departure.



Photo Gallery

Sampling Locations
str - stream site
rbi - right bank inflow
lbi - left bank inflow
inf -
999 - number corresponds to distance in ft.
- Injection point was at 15 ft.

Distance Type Description



235 str Transport Site BUL-1
235 str_b Transport Site BUL-1
346 lbi
355 lbi
582 lbi
733 lbi May not be 733
1874 lbi
1992 lbi
2155 str Transport Site BUL-2
2157_2191 inf Site 2157 or Site 2191
5245 lbi
5338 str Transport Site BUL-3

Miscellaneous

.
Description

Injection Site
Bullion Mine
Downslope from Bullion Mine



Results & Acknowledgments

Results

Data analysis is incomplete at this time.

Acknowledgments

Field assistance was provided by Fred Bailey, Mike Cannon, Tom Cleasby, Deann Dutton, Mike Gooseff, Dan Hayba, Jeff Johnson, Kevin Johnson, David Nimick, Ray TeSoro, Phil Verplanck, and members of the research team.