Bullion Mine
August 30 - September 1, 1998
Objectives & Sequence of Events
Objectives
Sequence of Events
| Aug 30 |
Injection setup. Injection site is at ~15 ft.
Injection begins (1603). |
| 31 |
Injection continues |
| Sept 1 |
Synoptic Sampling. Spot injection at Transport Site BUL-3.
Injection terminates (1710). Sampling of tracer departure.
|
Photo Gallery
Sampling Locations
| str | - stream site
|
| rbi | - right bank
inflow |
| lbi | - left bank
inflow |
| inf | -
|
| 999 | -
number corresponds to distance in ft. -
Injection point was at 15 ft.
|
| Distance |
Type | Description
|
| | |
| 235
| str |
Transport Site BUL-1 |
| 235
| str_b |
Transport Site BUL-1 |
| 346
| lbi |
| 355
| lbi |
| 582
| lbi |
| 733
| lbi |
May not be 733 |
| 1874
| lbi |
| 1992
| lbi |
| 2155
| str |
Transport Site BUL-2 |
| 2157_2191
| inf |
Site 2157 or Site 2191 |
| 5245
| lbi |
| 5338
| str |
Transport Site BUL-3 |
Results & Acknowledgments
Results
Data analysis is incomplete at this time.
Acknowledgments
Field assistance was provided by Fred Bailey, Mike Cannon, Tom Cleasby,
Deann Dutton, Mike Gooseff, Dan Hayba, Jeff Johnson, Kevin Johnson,
David Nimick, Ray TeSoro, Phil Verplanck,
and members of the research team.